• Surface and base course repairs, hydro-texturing, edge break and edge drop repairs, and texture improvement slurry.
• In-situ recycling of a 1.6km section of the road.
• Upgrading of rest areas and taxi/bus stops.
• Construction of concrete kerbing at intersections and installation of guard rails.
• 20mm/7mm/7mm double seal surface treatment with split application of 7mm aggregate to main line.
• 20mm Cape Seal to rest areas.
• Asphalt surfacing to intersections.
• Road marking.